|
Suppliers of : |
|
|
| Mild Stell Billets : |
| Size |
Grade |
Standard |
Length |
Origin |
| 100x100 MM |
3 SP |
Gost 380/94 |
6000 MM |
Ukrine |
|
125x125 MM |
|
ASTM |
9000 MM |
china |
|
125x125 MM |
5 SP |
A568M |
12000MM |
|
|
| top |
| Re Bars :
|
| Grade |
Size |
Length |
Origin |
| B5 4449/460 |
8MM/10MM/12MM |
12 meters |
China |
| Standard Gost 380/94 |
16MM/20MM/25MM/32MM |
|
Ukrine |
|
|
| Iron ore fines/Lumps :
|
Our principal is one of the biggest importers of iron ore in china to the tune of 5 million MT from India and also from Brazil.
We intend to deal only with direct exporters.
We need the following documents to send the contract after confirming the price. |
Brief Profile of the Iron ore Exporter.
Past performance/Latest Track record for export of iron ore fines such as copy of the latest & earlier Bill of lading, SGS report.
Exporter's Bank comfort Letter.
Present stocks in hand or consignment to be exported.
chemical composition should fulfill the following norms as mentioned hereunder. |
S.No |
Chemical composition |
FE 58% content |
FE 62% content |
FE 63.5% content |
1 |
SI 02 |
5.21 Max |
3.25% Max |
3.50% Max |
2 |
AI 203 |
4.87% Max |
3.25% Max |
4.00% Max |
3 |
Phosperous |
0.06% Max |
0.07% Max |
0.07% Max |
4 |
Sulphur |
0.06% Max |
0.06% Max |
0.03% Max |
| 5 |
Moisture |
8.00% Max |
8.00% Max |
8.00% Max |
| |
During (Monsoon) |
10.20% Max |
10.20% Max |
10.20% Max |
| |
Physical Properties |
|
|
|
6 |
Above 10 MM |
12.50% Max |
5.00 Max |
5.00 Max |
7 |
0 to 10 MM |
87.50% Max |
95.00 Max |
95.00 Max |
8 |
150 Microns |
32.10% Max |
45.00%Max |
45.00% Max |
9 |
Quantity |
30000 MT |
30000 MT |
30000 MT |
|
|
| HMS/Used Seamless Pipes Scrap/HMS1/used Rails :
|
Our Terms will be as follows: |
LOI with Bank
comfort Letter is to be given after confirming the Price. |
Inspection of the goods will be allowed outside India. |
Inland Letter of Credit will be accepted even with 90 days DA Terms. |
Container/Break bulk shipment – as per buyer's terms. |
Performance bond 2% will be given against Non Operative LC. |
Pre-advise LC is required before inspection. |
|
|